Senior Scaffold are proud to be part of the team with Woodview Construction in the refurbishment and structural upgrade of a circa 1927 Main Block and Hall at Takapuna Grammar School.

 

Senior Scaffold was involved in this project from inception in 2015 to design a free standing scaffold with temporary roof that can be opened up for concrete parapet replacement during construction.

 

  • Multiple stair access towers, loading platforms and rubbish chutes were erected.

​

  • A heavy duty scaffolding rubbish chute was specially built using trusses and plywood to enable safe dumpping of the concrete and tiles. 

​

Thanks to our brilliant design team and onsite crew, our scaffold stood the test of 5 years providing safe access and weather protection for our client.     

​

​

 