top of page

HNZC GREAT NORTH ROAD

  • Scaffold with full edge protection.

​

  • Part of the scaffold was cantilevered to give way to mobile cranes due to the tight driveway into the site.

​

  • Loading platforms to each floor made material within reach. 

​

  • Our 1.2 metre wide access stairs provided a comfortable and safe access for all trades onsite. 

​

  • A temporary roofing attached to the scaffold was later on erected to enable membrane roof works.

​

​

bottom of page